Building on the Highland bench

Highland is a big lot city by design, and that shapes almost every project in it. The house is rarely the only thing going on the property. Blackbird draws the plans and builds the job, out of Provo. Danny Bird has been building since 2001.

Building since 2001 Large lot properties Residential and commercial
Provo based, working across Utah County One builder from budget to final walkthrough Free estimates, in writing

The local picture

A bench nobody could farm, so nobody subdivided it

Highland is the way it is because of water. Christian Beck homesteaded a hundred and sixty acres out of Alpine in 1869. Without water rights, the bench was good for spring grazing and nothing else. That is what Lehi, American Fork and Alpine used it for.

So the valley floor below got farmed and then cut into house lots. The bench just sat. When it finally developed, it developed as big lot housing, and the zoning locked that in. The R-1-40 district allows one home per forty thousand square feet, with a minimum lot width of one hundred thirty feet.

The result is a city of big houses on big ground, most of it built from the eighties on. Those houses are now old enough to want real work. And the lots almost always have room for more.

Sport court and landscaped yard on a completed project, from a Blackbird project in Provo

A finished Blackbird project in Provo. We have no completed project photos from Highland to show yet.

Planning a large lot

The acre is the project, not the house

Most Highland owners build three or four things over a decade. The cheapest version is the one planned as a whole.

Drive, park, store

Shops, detached garages and RV parking are among the most requested structures on a Highland lot. Where they go decides where the driveway goes. And the driveway decides everything else about how the property works.

Grade and drainage once

Water has to leave an acre somewhere. Set the finished grades, swales and hard surfaces once, in one plan. That is far cheaper than regrading around each new project as it lands.

Utilities that reach

Power, gas, water and drainage out to a shop, a pool house or an outdoor kitchen are long runs on a lot this size. Trenching once, and leaving stubs for later, costs almost nothing extra. Trenching three times costs three times.

The addition you have not designed yet

If a wing, a garage bay or a second story is even a maybe, say so early. A roof line and a foundation can be built ready for it. Adding that support later is where additions get expensive.

Ground and paperwork

Two things that surprise people building in Highland

Bench ground digs slowly

The bench is built from material shed off the Wasatch, then reworked by ancient Lake Bonneville into deltas and terraces. That means gravel and cobble in places. Great support and great drainage. But slower, costlier digging and trenching than the finer soils out on the valley floor. On a long run across an acre, it adds up.

The mountain front is right there

Dry Creek runs through the area, and the Wasatch fault zone runs along the base of the range just east of town. That is not a reason for alarm. It is a reason to spend a little on a geotechnical look before you design a foundation. That is a soil and rock study by an engineer. Also check your parcel on the Utah Geological Survey's public geologic hazards map. Anyone can do that for free.

A complete application is the whole schedule

Highland reviews your application once it is complete, with all required documents in it. A deposit is due when construction plans go in. The fastest permit is always the one that never came back for missing structural calculations.

Everything Blackbird does

What Blackbird can do on a Highland property

On an acre, most owners do more than one of these. Planning them together is usually cheaper than doing them one at a time.

Questions

Building and remodeling in Highland

Who issues building permits in Highland?
Highland City's Community Development department, at 5400 West Civic Center Drive. It runs both the development code and the building code. The city reviews your application once it is complete, with every required document in it. A deposit is due when you turn in construction plans, and it gets applied against the final permit. Site plan review is a separate step, and it sometimes comes with an architectural design review of the buildings. That step applies to non-residential, townhome and multifamily projects, not to a single family house.
Why are Highland lots so big?
History and water. Settlers homesteaded the Highland bench in the late 1860s. Without water rights, the bench was useless for anything but early spring grazing. That is what Lehi, American Fork and Alpine used it for. So it never got farmed and cut up the way the valley floor did. Highland developed late, and it developed large. The zoning kept that pattern. The R-1-40 district, for example, allows one home per forty thousand square feet, a bit under an acre, with a minimum lot width of one hundred thirty feet.
What does a big lot change about a remodel?
It changes the order of operations. On a quarter acre, you do the kitchen and that is the project. On an acre, the kitchen, the shop, the patio, the sport court and the future addition all compete. They share the same driveway, the same utility runs and the same grading plan. Doing them in a planned order costs meaningfully less than doing them one at a time as they occur to you. You stop paying for the same site work twice.
What is the ground like up there?
The bench is built largely of material shed off the mountains, then reworked by ancient Lake Bonneville into deltas and terraces. That makes it coarse, gravelly and cobbly in places. It drains well and it bears well. It also digs slowly. Digging and trenching cost more per foot through cobble than through silt, and on a long utility run across an acre that difference is real. Dry Creek runs through the area, and the Wasatch fault zone runs along the base of the mountains just east. So a site specific geotechnical look is worth its cost on a new build. That is a soil and rock study by an engineer.
Do you build shops and detached garages?
Yes. On Highland lots they are one of the most requested structures, and they are a real building, not a kit. Foundation, structure, power, heat, drainage, and a driveway that can take the vehicle you actually park in it. They also have to be placed with the rest of the property in mind. That is why they belong in the same plan as the house.

Nearby

Blackbird also builds in these Utah County cities

Highland sits between Alpine and American Fork, with Lehi just west.

Tell us what you want to do with your Highland property

House, shop, addition, back yard, or all of it in the right order. The first talk is free, and it is with Danny.

Or call or text (385) 334-5658
Call or text (385) 334-5658 Free estimate