Home / Service areas / Lehi

Service area · Lehi, UT

Building in Lehi, Utah

Lehi is really two building markets. On the north end there is a hillside, where every lot raises an engineering question. Below it sits a valley floor full of subdivisions built in the last twenty years. Blackbird draws the plans and builds the job. We work out of Provo, and Danny Bird has been building since 2001.

Building since 2001 One team, plans to finished Residential and commercial
Provo based, working across Utah County One builder from budget to final walkthrough Free estimates, in writing

The local picture

Young houses in Lehi, older questions in the ground

Most of what stands in Lehi today went up in the last twenty years. Traverse Mountain sits on the north bench. Holbrook Farms, Spring Creek, and the planned communities along the Pioneer Crossing corridor are all newer. They were built fast, and built to a big builder's spec sheet.

That shapes what people call a contractor for here. It is rarely a full gut job. It is a basement the builder roughed in and left unfinished on purpose. It is a back yard that came with a slab, a fence, and nothing else. Or it is an addition on an older house near the original town center. Those houses were framed in a different century from the subdivision three blocks away.

The other half of Lehi is business property. The tech corridor around Thanksgiving Point and the Silicon Slopes campuses keeps work coming. Offices get fitted out, remodeled and expanded. The city also keeps approving townhomes and apartments for the people who work there.

Great room with a linear fireplace opening to a kitchen, from a finished Blackbird project in Provo

A finished Blackbird project in Provo. We have no completed project photos from Lehi to show yet.

Site conditions

Four kinds of Lehi lot, four different foundations

Lehi runs from the Traverse Mountains down to Utah Lake. The dirt is not the same at both ends.

The Traverse Mountain bench

Steep, rocky, and cut into a hillside. Homes up there sit right where flat ground breaks into mountain. That is why so many Traverse Mountain subdivisions have a geotechnical study on file, which is a soil and rock report done by an engineer. Expect retaining walls, engineered fill, a real grading plan, and a driveway that has to hold a legal slope.

Slope triggers in the code

Lehi's hillside preservation rules start asking questions at ten percent slope. Above thirty percent, the city restricts grading unless it accepts an engineer's analysis. Grading permits run under their own ordinance. On a bench lot, that engineering is a real line item, not a formality.

Low ground toward the river

The Jordan River leaves Utah Lake at Lehi's south and west edge. Low ground near a lake and a river outlet is where water sits close to the surface. That is what turns a basement dig into a pumping job. Find that out before you design a basement, not during.

Newer subdivision lots

Small, flat, graded, and tightly set back. The HOA usually has rules about outside materials and how far a structure can reach into the yard. Soil is rarely the problem on these lots. Setbacks, easements and HOA review are.

Permits and plan review

How a Lehi permit actually moves

Lehi City runs its own building department. Nothing here goes through the county.

Everything is digital

You file the application and the drawings on Lehi's online permit portal. Plan review happens on screen. The approved set comes back stamped on every page, so the inspector checks the job against one exact version of the plans. Keeping one current set is the whole game.

A complete application starts the clock

State law gives cities fourteen business days to finish plan review on a one or two family home or a townhome. It gives twenty one business days for a home built under the International Building Code. Both clocks start only once your application is complete.

Inspections have a deadline too

Utah Code says something else useful. If a city cannot inspect within three business days of your request, you may hire an outside inspection firm. Most jobs never need that. Knowing it is there changes how you plan a tight week.

What we get called for

The Lehi projects that come up most

Basements left unfinished

This is the default in a Lehi house built after 2000. Three things drive the layout more than taste does. Escape windows, ceiling height under the ducts, and where the builder left the plumbing.

Back yards that came with nothing

A new subdivision hands you a slab and a fence. Covered patios, outdoor kitchens and real drainage turn that into space you use.

Additions on the older blocks

Around Lehi's original core the houses are older and smaller. They are built nothing like a 2015 home. An addition there is a framing and foundation problem first, and a design problem second.

Custom homes on remaining lots

Empty lots in town, and lots on the hillside. Both need the site work priced honestly first. Otherwise the house gets designed around a number that was never real.

Work on business space

Offices and shops getting fitted out along the corridor. The lease date sets the schedule, so hitting the date is the job. See commercial construction.

Multi-family

Townhomes and apartment buildings. Lehi has approved a lot of them. See multi-family construction.

Everything Blackbird does

What Blackbird can do on a Lehi project

Ten services, and most Lehi jobs use two or three of them. Start anywhere on this list.

Pre-construction: planning before you build

We find out whether your Lehi lot can really hold what you want, before you spend money on design. Slope, access and utilities all carry a price.

Construction cost estimating: a real budget first

A line by line budget for the job you are describing. You get it before drawings lock in choices that cost a lot to undo.

Owner's representative: someone on your side

This role is called an owner's representative. We check another builder's bid, contract, work and bills for you. Blackbird sits on your side of the table, not the builder's.

Design-build: one team from plans to finished

Design, budget, permits and building under one contract. One number to call when something needs a decision.

Custom home building

New homes on the lots Lehi has left, including hillside lots that need a grading plan before anything else.

Commercial construction and tenant improvements

Offices and shops fitted out, remodeled and expanded, along the Lehi tech corridor and the older business blocks in town.

Multi-family construction

Apartments, townhomes and condos, which make up a large share of what Lehi has been approving.

Home remodeling and additions

Kitchens, whole-home remodels and structural additions. Common on Lehi's older blocks and its first subdivisions.

Basement finishing

Bedrooms, bathrooms, theaters and gyms in the unfinished basements most Lehi houses came with.

Outdoor living

Covered patios, decks and outdoor kitchens, plus the grading and drainage that make a Lehi back yard work.

Commercial property in Lehi?

This page is written for homeowners

Are you fitting out a space you rent out? Building from the ground up? Fixing up a building you own? The timeline and the permit path are different. We keep all of that on its own page.

Commercial contractor in Lehi

Questions

Building and remodeling in Lehi

Who issues building permits in Lehi?
Lehi City does, through its Building and Inspections division. You file the application and the drawings on the city's online permit portal. Review happens on screen. The approved sheets come back stamped page by page, so the inspector in the field reads the same set you do. A grading permit is separate. It falls under the city's grading ordinance, and it matters on almost any sloped lot.
My Lehi lot is on a slope. Does that change anything?
Yes, and sooner than most people expect. Lehi's hillside preservation rules apply to anyone who wants to grade, dig, fill, or build on a slope steeper than ten percent. On slopes over thirty percent, the city limits grading unless an engineering analysis supports it and the city accepts that analysis. There are also ridgeline rules about buildings that stand out against the sky. None of that stops a good lot from being built. It just means the retaining walls, the driveway grade and the engineering belong in the price up front, not in a surprise later.
How long does plan review take?
Utah law sets a deadline instead of leaving it open. Under Utah Code 10-20-909, a city has to finish plan review on a one to two family home or a townhome within fourteen business days of a complete application. The key word is complete. An application missing structural calculations or an energy compliance report has not started the clock. Getting the package right the first time is the cheapest time you will ever buy.
Do you finish basements in newer Lehi homes?
Yes. Most houses built here since the early 2000s were sold with the basement roughed in and left unfinished. It is the most common project in the city. See basement finishing. Three things set the layout. Egress windows, which are the escape windows a bedroom has to have. Where the builder left the plumbing. And how much heating and cooling the system the builder installed can handle.
You are based in Provo. Is Lehi far for you?
No. Blackbird works across Utah County, and Lehi is a straight run up I-15. Danny Bird walks the site, writes the budget and runs the job. Who shows up matters more than the drive. It is the same person on a Lehi job as on a Provo one.

Nearby

Blackbird also builds in these Utah County cities

Lehi sits at the north end of the county. Most of our nearby work is on the same side of the valley.

Tell us about your Lehi project

A lot, a set of plans, a house you already own, or just a budget you have to hit. The first talk is free, and it is with Danny.

Or call or text (385) 334-5658
Call or text (385) 334-5658 Free estimate