Home / Services / Kitchen remodeling

Improve · Utah County

Kitchen remodeling in Provo and Utah County

New cabinets, a layout that works, and the wall you want gone. Danny Bird has been building since 2001. He is the one who prices your kitchen and he is the one who runs the job.

Building since 2001 One team, plans to finished We take out walls ourselves
Provo based, working across Utah County One builder from demo to the last small fix Free estimates, in writing

Before you pick a cabinet door

A kitchen is the hardest room in the house to remodel

Almost every system in your home meets in the kitchen. Water, drains, gas, power, and air all land in the same forty square feet. Then you set heavy cabinets and stone on top of all of it.

That is why two kitchens the same size can cost very different amounts. One keeps the sink and the range right where they are and swaps the cabinets around them. The other moves the sink, moves the range, and takes out a wall. Same room. Nothing like the same job.

So we start with the boring part. We find out what your walls are actually doing, where the pipes and the gas line run, and what your electrical panel can carry. Then we price it. Blackbird draws the plan and builds the job, so you learn what a change costs while it is still a line on paper.

Dining area open to a remodelled kitchen

Before and after

The same kitchen, before and after

Dark wood cabinets and a closed in galley at the start. Cream cabinets, a full island, and a room people can stand in together at the end.

A kitchen Blackbird remodelled

Dated kitchen with dark wood cabinets before the remodel
Before
The same kitchen after the remodel with cream cabinets, an island and stainless appliances
After

New cabinets, new appliances, and a full island. The parts you can see go in last. Before any of them, somebody has to sort out the drains, the gas, and the wiring, and prove it to an inspector.

More kitchens

Corner of the same dated kitchen before the remodel
BeforeAnother angle on the same kitchen
Dining area open to the remodelled kitchen
AfterDining open to the kitchen
Kitchen with white oak cabinets and a large stone island
Another Blackbird kitchenWhite oak, with stone running down the end of the island

Where the money goes

What actually decides the price of a kitchen

People budget for the things they can see. The number is mostly set by things you will never look at again.

Cabinets

Cabinets are usually the biggest single line on a kitchen. There are three broad choices. Boxes off a shelf in standard sizes. Boxes built to standard sizes but finished to your order. Or boxes built from scratch to fit your room. Same wall, three very different prices. Odd sizes, tall doors, and drawers instead of shelves all push it up.

Moving water, drains, and gas

Leaving the sink and the range where they are is the cheapest kitchen you can build. Move them and somebody has to open a floor or the ceiling below, run new pipe, run a new vent, and run a new gas line. Drains are the fussy one. They only work if they fall at the right slope, so the floor sometimes decides the layout.

The wall you want gone

If the wall is load-bearing, which just means it is holding up the floor or the roof above, it cannot simply leave. A beam takes its place, and an engineer has to size that beam. Then the weight has to travel down to concrete that can carry it. Normal work, but it adds drawings, a permit, and framing days.

Appliances and countertops

A range from a big box store and a pro style range are not close in price, and the big one often wants more gas and a bigger vent hood. Countertops swing the same way. Laminate, quartz, and natural stone are three different numbers, and stone gets priced by how many seams and cutouts your layout needs.

The most common surprise

Opening the kitchen to the living room usually means a beam

This is the thing that catches people out more than anything else on a kitchen. It is worth understanding before you fall in love with a photo.

What load-bearing means

Some walls only divide rooms. Others are holding up the floor above, or the roof. Those are the load-bearing ones. You cannot tell which is which by looking at the wall, and knocking on it does not tell you either. Somebody has to get in the attic and the basement and follow the weight down.

A beam takes the wall's place

Pull the wall out and a beam goes in above the opening. An engineer works out how deep and how strong that beam has to be. It might be wood. It might be steel. A wider opening needs a bigger beam, and a bigger beam is heavier, more expensive, and harder to lift into place.

The weight has to land somewhere

A beam pushes everything it carries onto its two ends. Those ends need posts, and the posts need something solid under them all the way down to concrete. Sometimes that is a post in the basement you were not planning on. Sometimes it means cutting the basement floor and pouring new concrete under it.

Permits in Utah County

Most Utah County cities run their own building department, so Provo, Orem, and Lehi each handle the paperwork a little differently. The rule is the same everywhere. Move a wall that holds the house up, or move gas, drains, or wiring, and the city wants a permit and the engineer's drawing. We file it, we answer the reviewer, and we book the inspections.

What is included

What Blackbird handles on a kitchen

Layout and design

Where the sink goes, where the range goes, and how the room behaves when three people are in it. We draw it against your budget, not apart from it, so a change costs you a pencil instead of a change order.

Cabinets and built-ins

Cabinet layout, the order, the final measure once the walls are real, and the install. Plus the pantry, the trim, and any piece that has to be built to fit a spot nothing off a shelf will fill.

Walls, beams, and posts

Taking out walls that hold the house up, the beams and posts that replace them, and the engineer's drawing behind each one. Most kitchen companies hand this off. Blackbird treats it as the main event.

Plumbing, gas, and wiring

New drains and vents, water lines, gas for a range, and the circuits a modern kitchen needs. Older homes often need a bigger electrical panel before anything else can go in. We price that up front.

Counters, tile, and floors

Countertops measured after the cabinets are set, backsplash tile, and floors that run level from the kitchen into the next room. Each one gets a real dollar amount set aside before you start choosing.

Permits and inspections

Plans, the filing, the reviewer's comments, and every inspection. If the job grows past the kitchen, see home remodeling and additions. You should never be the one calling the building department.

How long it really takes

What takes the time on a kitchen, in order

Hardly anyone is slowed down by the part they worry about. The waiting happens before the noise starts, and then once more right at the end.

1. Deciding and drawing

Layout, cabinet sizes, and appliance picks. If a wall is coming out, the engineer's drawing and the city review happen here too. Nothing gets ordered until this is settled, because the cabinet order is built straight from these numbers.

2. Waiting on cabinets

This is normally the longest single wait on a kitchen, and the clock starts the day the order goes in. Your cabinets are built to your sizes, so they are not sitting on a shelf anywhere. We time demo around the delivery date instead of tearing your kitchen out and then waiting.

3. Demo and rough-in

The old kitchen comes out. Pipes, gas, and wiring get moved, the beam goes in if there is one, and the city inspects all of it before anything gets covered up. Then insulation and drywall, and the room starts to look like a room again.

4. Cabinets, stone, and finish

Cabinets get set and levelled. Only then can the countertop be measured, because stone is templated off the cabinets that are actually there. That is a second wait, a shorter one. Then backsplash, paint, appliances, and the small fixes at the end.

Living through it is the part nobody plans for. You are without a kitchen from demo day until the appliances are hooked back up. Set up a temporary one somewhere else in the house first: a fridge, a microwave, a kettle, and paper plates. And ask any builder you talk to for the date your sink goes back in. That is the date that actually matters to you.

Questions

Kitchen remodeling in Utah County

What does a kitchen remodel cost?
It depends far more on what is behind the walls than on what goes on them. Two kitchens the same size can cost double one another once one of them needs a wall taken out, the drains moved, and a bigger electrical panel. Cabinets, appliances, and countertops then swing the number again, because each of those has a cheap version and an expensive version. Anyone who gives you a price per square foot before walking your house is guessing. We would rather build you a real budget, broken out line by line, which is free.
Can you take out the wall between my kitchen and the living room?
Usually yes. The real question is what that wall is holding up. If it is load-bearing, meaning it carries the floor or the roof above it, it gets replaced with a beam that an engineer sizes. The weight then travels down through posts to concrete that can carry it. That is ordinary work for us. It just has to be drawn, permitted, and priced before demo day rather than figured out afterward.
How long will I be without a kitchen?
From demo day until the appliances go back in, which is most of the job. We will not pretend otherwise. What we can do is keep that stretch as short as it can be, mostly by not starting demo until your cabinets are built and on the way. Set up a temporary kitchen somewhere else in the house before we start, and ask us for the date your sink comes back. That is the date you will actually feel.
Why does moving the sink or the range cost more?
Because water, drains, and gas do not move easily. A drain only works if it falls at the right slope the whole way, so moving a sink often means opening the floor or the ceiling of the room below to re-run it. Gas needs a new line and a new shutoff. A range in a new spot usually needs a new vent to the outside as well. Keeping those three things where they already are is the single biggest saving on most kitchens.
Do I need a permit to remodel a kitchen in Utah County?
It depends on what you are changing. Move a wall that holds the house up, add or move drains, gas, or wiring, and the city wants a permit. Swapping cabinets, counters, and flooring in the same spots usually does not need one. Most Utah County cities run their own building department, so Provo, Orem, and Lehi each handle it a little differently. We pull the permits and run the inspections either way, so it never becomes your problem.
What holds up a kitchen job the most?
Cabinets, almost every time. They are built to your sizes after your layout is final, so the wait starts at the order and there is no way to buy it back later. Countertops are the second one. Stone cannot be measured until the cabinets are standing in the room, so that wait lands right at the end when you are ready to be done. Both are easy to plan around and painful to discover halfway through.

Related

Often hired alongside this

Where we work

Kitchen remodeling across Utah County

Tell us what you want your kitchen to do

New cabinets in the same spots, or the whole room opened up. The first conversation is free and it is with Danny.

Or call or text (801) 735-7186
Call or text (801) 735-7186 Free estimate