Home / Services / Bathroom remodeling

Improve · Utah County

Bathroom remodeling in Provo and Utah County

New showers, new tubs, and layouts that finally fit the room. The part that decides whether it lasts is the waterproofing you will never see. Danny Bird has been building since 2001, and he prices your job himself.

Building since 2001 Waterproofed and water tested One team, plans to finished
Provo based, working across Utah County One builder from demo to the last small fix Free estimates, in writing

Start here

A bathroom is the one room you spray with water on purpose

Every other room in your house is built to stay dry. A bathroom is not. So the real job is not the tile you pick. The real job is keeping water inside the shower and out of your framing.

Here is the part most people do not know. Tile is not waterproof. Grout is not waterproof either. Water goes right through grout. It always has. Tile is the surface you walk on and look at. Something behind it has to stop the water.

That something is a waterproof layer. It is either a thin sheet or a coating that gets painted on, and it goes on the walls and floor before a single tile is set. Skip it, rush it, or leave a gap in it, and water soaks into the wood behind your shower. You will not see it for a year or two. Then the tile starts to move, the ceiling below the bathroom stains, and the fix is not a new shower. It is a new shower plus the framing, the drywall, and the ceiling underneath.

This is why waterproofing is the one place you cannot save money. It is a small slice of what a bathroom costs and it carries almost all of the risk.

Tiled shower with a built-in bench

The work you never see

What real waterproofing means, in plain words

Four things. None of them show up in the finished photos, and all four are the reason a shower is still dry in fifteen years.

A waterproof layer behind the tile

A sheet or a painted-on coating that covers the whole wet area before any tile goes up. It has to run past the edges of the shower, not stop at them. Water travels sideways. If the layer ends where the tile ends, water walks right around it.

A shower pan that is built, not bought

The shower pan is the waterproof tray under the shower floor. It has to slope evenly toward the drain from every direction. A flat spot holds water, and water that sits will find a way out. The pan and the wall layer have to be joined so they act as one piece.

Corners, seams, and the curb

Leaks almost never start in the middle of a wall. They start where two planes meet. Inside corners, the joint at the floor, the top of the curb you step over, and every pipe that pokes through. Each of those gets sealed on its own before the main layer goes on.

A water test before any tile

We plug the drain, fill the pan with water, and leave it. Then we check the ceiling below. If it is dry, the pan is good. If it is not, we fix it while fixing it costs almost nothing. Testing after the tile is on is not a test. It is a demolition plan.

Bathroom vanity with twin mirrors and wall sconces

Layout

Moving the toilet a few feet is not a small change

Water pipes can bend around almost anything. Drains cannot. A drain has no pump behind it. Gravity is the only thing moving what is inside it, so every drain has to run downhill the whole way to the main line.

The rule of thumb is about a quarter inch of fall for every foot of pipe. That does not sound like much until you move a fixture ten feet. Now the pipe has to drop two and a half more inches somewhere, and it has to do that inside a floor that is already only so deep.

The toilet is the hard one. Its drain is the biggest pipe in the room. If your bathroom sits on a concrete slab, moving the toilet means cutting the concrete, digging, re-piping, and pouring it back. If it sits over a basement or a crawl space, it means opening the ceiling below and cutting into the floor joists, which an engineer may need to sign off on.

There is one more piece people forget. Every drain also needs a vent, which is a pipe running up through the roof that lets air in behind the water. Without it, a draining tub can suck the water out of a nearby trap and your bathroom starts to smell like the sewer.

So here is the honest advice. If your current layout works, keeping the toilet, tub, and shower where they are is the single biggest way to control what this costs. If the layout does not work, move it, but price the plumbing before you fall in love with the drawing.

Details that decide the outcome

Four more things that decide whether your bathroom lasts

Every one of these is invisible when the job is done, and every one of them shows up later if it was done badly.

The fan, and why bathrooms grow mould

A hot shower puts a lot of water into the air. If that air does not leave the house, it cools on the ceiling and the walls and turns back into water. That is what feeds mould. Three things go wrong here all the time. The fan is too small for the room. The fan runs but dumps into the attic instead of outside, which just moves the problem. Or the fan is fine and nobody runs it long enough. We size the fan to the room, duct it all the way outside, and put it on a timer so it keeps running after you leave.

What is under the tile matters more than the tile

Tile is only as good as the surface it is stuck to. Regular drywall in a wet area will fail, and green drywall is not much better. Wet walls need cement board or a waterproof panel made for the job. Floors need a base that does not flex, because tile does not bend. If the floor moves under your feet, the grout cracks first and then the tile does. Sometimes that means adding a layer of plywood or a mortar bed before anything else happens.

Older Utah County homes, and what the wall shows

Plenty of homes here were built long before the 1980s, and their bathrooms are still on the original plumbing. Open a wall and you may find cast iron drains, which are heavy black pipe that rusts and flakes from the inside until the opening is half its original size. Or galvanized water pipe, which is steel that rusts shut the same way and is the real reason the pressure is weak. You may also find a vent that was never legal, or a drain with no fall in it at all. None of that is a disaster. It is just work, and it needs to be priced the day it is found, not folded in quietly.

What actually takes the time

A bathroom is small, so people expect it to be quick. It is not, and it is worth knowing why. The plumber and the electrician have to finish before the walls close, then the city has to inspect that work before anyone covers it. Waterproofing has to cure and then get water tested. Tile gets set one day and grouted the next, and both need to dry. On top of all that, the tub, the tile, the vanity, and the glass shower door often have lead times, and glass is usually measured only after the tile is done. The way to shorten a bathroom is to order everything before demo day, not to rush the parts that need to dry.

What is included

What Blackbird handles on a bathroom remodel

Showers and tubs

Tiled showers, freestanding tubs, glass, benches, and niches. Built waterproof first and finished second, in that order, every time.

Plumbing and layout changes

Moving drains, vents, and supply lines when the layout has to change. Cutting and repouring slab when that is what the toilet needs.

Tile, stone, and the base under it

Floors, walls, curbs, and thresholds. We fix the surface underneath before tile goes on, because that is the part that decides whether the grout cracks.

Electrical and lighting

Shock-safe outlets, vanity lights, sconces, heated floors, and enough light at the mirror to actually see. Older homes often need the circuit upgraded first.

Ventilation

A fan sized to the room, ducted all the way outside, and set on a timer. This is the cheapest part of the job and the one that saves the ceiling.

Permits and inspections

Filing with your city, meeting the inspector, and handling whatever gets flagged. You should never be the one calling the building department.

Asked for more every year

Curbless showers and bathrooms that still work in twenty years

More clients now ask for a shower with no step to get over. Some want it because they plan to stay in the house. Some just like how it looks. Either way it is a framing decision, so it has to be made early.

No step means the floor has to drop

A curbless shower still needs slope to the drain. With no curb holding the water back, that slope has to start below the level of your finished floor. On a wood floor that usually means cutting or building down the joists in that one area. On a slab it means cutting the concrete. Neither is hard. Both are impossible to add later without tearing the room out again, which is why this gets decided before framing.

Wider doors and a bigger turning space

A bathroom you can use with a walker or a wheelchair needs a wider doorway and clear floor to turn around in. Getting that often means borrowing a foot from a closet or a hallway. It is much cheaper to do while the walls are already open.

Blocking now, grab bars whenever you want

Grab bars have to screw into solid wood, not drywall. So while the wall is open we screw flat boards between the studs where a bar might ever go. It costs almost nothing today. It means a bar can be added in an hour later, instead of opening a tiled wall to find something to screw into.

Why this goes better with one company

A bathroom is five trades standing in a very small room

A bathroom is the smallest room in the house and it holds the most trades. They cannot all work at once, and each one has to leave the room exactly right for the next one. Get the order wrong and somebody has to undo finished work.

Demo, then the plumber and the electrician

Everything in the walls happens first, while the walls are open. Drains, vents, supply lines, and wiring all get set to the exact spots the finished fixtures need. A tub set an inch off from the drawing is a real problem later.

Then the inspection, then the walls close

The city looks at the rough plumbing and wiring before anything covers it. Miss this and you are opening a wall you already paid to close. We book it and we meet the inspector.

Then waterproofing, and the water test

The waterproof layer goes on, cures, and gets filled and tested. Nothing gets tiled until that test passes. This is the step that gets skipped when a schedule is behind, and it is the one step that must not be.

Then tile, then everything you actually see

Tile, grout, vanity, mirrors, lights, trim, paint, and the glass door measured to the finished tile. One person keeps this sequence honest and calls the next trade in. If you hire the trades one at a time, that person is you.

Questions

Bathroom remodeling in Utah County

What does a bathroom remodel cost?
Two bathrooms the same size can cost very different amounts, and the tile is rarely the reason. What moves the number is whether the toilet, tub, or shower moves, whether the old plumbing has to be replaced, whether the shower is curbless, and whether the electrical panel can carry what you are adding. Anyone who gives you a price before walking your bathroom is guessing. We will walk it and build you a real budget, broken out line by line, for free.
How long does a bathroom remodel take?
Longer than the size of the room suggests, and most of it is waiting rather than working. The rough plumbing and wiring have to be inspected before the walls close. The waterproofing has to cure and then pass a water test. Tile gets set one day and grouted another, and both need to dry. On top of that, tubs, tile, vanities, and glass doors can take weeks to arrive, and the glass is usually measured only after the tile is finished. We give you a real schedule up front, and the fastest thing you can do is order everything before demo day.
Can you move my shower or toilet?
Usually yes, but it is not a small change. Drains have no pump. They run on gravity, so a moved drain still has to fall about a quarter inch for every foot of pipe, all the way to the main line. The toilet is the hardest one because its drain is the biggest pipe in the room. On a concrete slab that means cutting the concrete and pouring it back. Over a basement it means opening the ceiling below. We price that honestly before you commit to a new layout, not after.
Do I need a permit for a bathroom remodel?
If you are moving or adding plumbing or wiring, yes. Most Utah County cities run their own building department, so the forms and the fees change a little from Provo to Orem to Lehi, but the rule is the same everywhere. Swapping a vanity or retiling in the same spot usually does not need one. We pull the permits and meet the inspectors either way, so it never becomes your job.
There is always mould on my bathroom ceiling. Will a remodel fix it?
It will if we fix the cause, and the cause is almost always air, not tile. A hot shower fills the room with water in the air. If it cannot get outside, it settles on the ceiling and feeds mould. So we check three things. Is the fan big enough for the room. Does the duct actually run to the outside, or does it stop in the attic, which is very common. And does the fan run long enough after the shower. A timer switch fixes that last one for very little money.
Our house is older. What will you find when you open the wall?
In older Utah County homes the usual finds are cast iron drain pipe and galvanized water pipe. Both are metal that rusts from the inside, so the drain slows down and the water pressure drops. We also find vents that were never done right, drains with no fall in them, and framing somebody cut through for a pipe years ago. None of it is a crisis. It just has to be found early, priced the same day, and shown to you with your options before anyone keeps working.

Related

Often hired alongside this

Where we work

Bathroom remodeling across Utah County

Tell us about your bathroom

A shower that leaks, a layout that never worked, or the whole room down to the studs. The first conversation is free and it is with Danny.

Or call or text (801) 735-7186
Call or text (801) 735-7186 Free estimate