Home / Service areas / Orem

Construction · Orem, UT

Remodels, additions, and new builds in Orem, Utah

Orem is close to built out, so most work here means changing a house that already exists rather than starting from dirt. That is a different skill from tract building. Danny Bird has been building since 2001.

Building since 2001 Provo based, working across Utah County Design-build under one roof
A real budget before drawings Additions and whole-home renovations One builder, start to finish

The local picture

A city with almost no land left, which changes everything

Orem grew up on the Provo Bench, and it was orchards before it was houses. The city's own general plan describes an agricultural community where farms, orchards, and open fields dominated the landscape, and the ground was fertile enough that the area helped earn Provo its old reputation as the Garden City of Utah.

Then it grew very fast. Orem counted 8,351 people in 1950, 18,394 in 1960, 52,399 in 1980, and 98,129 in the 2020 census. The push started with Geneva Steel, built in the early 1940s for the war effort, and Orem adopted its first zoning ordinance in 1946.

The result today is a city that is essentially full. Orem's general plan counted roughly 889 acres undeveloped, under 8 percent of the city, and only about 378 acres of that zoned residential. So the work here is remodeling, additions, basement build-outs, and infill. If someone tells you they are going to build you a new house in Orem, the first question is where.

Renovated kitchen and dining area with an island and full height cabinetry

Permits and approvals

How Orem actually reviews a project

Orem publishes more of its own requirements than most Utah County cities, which makes it easier to plan against once you know where to look.

Community Development and CityInspect

Permits come from the Community Development Department at 56 North State Street, which holds Building Safety, Engineering, and Planning and Zoning. Submittals are online through CityInspect.

The Development Review Committee runs weekly

Site plan and subdivision work goes through the DRC on a weekly cycle. Payment is due Monday at noon to be reviewed that week, and redlines come back by email on Tuesday. Miss the Monday and you have lost a week.

Submittal standards are specific

Wet-stamped structural calculations are required. Sloped lots need a topographical plot plan. New construction adding 500 square feet or more of footprint needs a stormwater pollution prevention plan.

Retaining walls have their own permit

Any retaining wall four feet or taller, measured from the bottom of the footing, requires a separate permit. On a sloped Orem lot that is a real scope and budget item, not a detail.

Design criteria and ground

The numbers and the conditions that set an Orem budget

Orem publishes its local design criteria, and its general plan is candid about where the ground gets difficult.

Frost depth of 30 inches

Footings go below it, on the house, the porch piers, and any hardscape that needs to stay put. It is a fixed cost on every foundation in the city.

115 mph design wind speed

Drives sheathing, fastening, and connection detail. It matters most on tall walls, large glazing, and covered outdoor structures, which is exactly what people add to an Orem house.

High groundwater on the west side

Orem's general plan flags the low-lying Lakeview area toward Utah Lake for a high water table, wetlands, the fluctuating lake level, and high potential for liquefaction during an earthquake.

Hazard rules live in the subdivision code

Orem has no hillside or geologic overlay zone, but its subdivision code carries supplementary design standards for hillside development, seismic areas, floodplains, and high water table areas.

Neighborhoods

Orem has 22 officially named neighborhoods across nine districts

Where the house sits changes its era, its framing, and often its ground. These are the city's own names, not marketing labels.

Against the mountains

Canyon View, Cascade, and Orchard sit toward the east side near the mouth of Provo Canyon, where the Olmsted Station powerhouse has stood since 1904 and US-189 heads up toward Heber.

The central postwar core

Orem, Sharon, Sharon Park, Hillcrest, and Orem North hold much of the older housing, including the stock that went up around the Geneva Steel boom years.

The 1970s and 1980s expansion

Heatheridge, Northridge, Windsor, Aspen, and Timpview are largely the decades when Orem grew fastest. Solid framing, dated systems, and floor plans people now want opened up.

Toward the lake

Lakeview and Lakeridge run west and south toward Utah Lake. This is where the general plan's high groundwater and liquefaction concerns are concentrated.

Geneva Heights and the west side

Named for the steel mill era, though the mill site itself is in Vineyard, not Orem. Christeele Acres, built in 1943 as Geneva Steel worker housing, is a listed historic district here.

Around University Place and UVU

The former University Mall opened in 1973 and has been redeveloped into a mixed-use district. Utah Valley University sits on former farmland in southwest Orem next to I-15.

Every service, in Orem

Every Blackbird service, available in Orem

Blackbird groups ten services under plan, build, and improve. In a city with almost no vacant land, most Orem projects live in the improve group, and the planning services are what keep an ambitious remodel from turning into a bad surprise.

Recent work

Finished Blackbird work

Blackbird is based in Provo and works across Utah County. The photos below are from a Provo project, and they are labeled that way on purpose.

Two story home after a full exterior renovation with new cladding, roof, and windows
A finished Blackbird project in ProvoWhole home renovation
The same home before renovation with original cladding and windows
The same house, beforeBefore
Renovated kitchen with an island and full height cabinetry
A finished Blackbird project in ProvoKitchen

Questions

Building in Orem

Who issues building permits in Orem?
Orem's Community Development Department at 56 North State Street, which contains Building Safety, Engineering, and Planning and Zoning. Permits are submitted online through CityInspect. If your project needs a site plan or a subdivision, it also goes through the Development Review Committee, which runs on a weekly cycle: pay by Monday at noon to be reviewed that week, and redlines come back by email on Tuesday. Knowing that cycle is the difference between losing a week and not.
Why is so much Orem work remodeling instead of new construction?
Because Orem has essentially run out of land. The city's own general plan counted roughly 889 acres undeveloped, under 8 percent of the total land area, with only about 378 acres of that zoned residential. That is room for a few thousand more residents, not a new suburb. If you want to live in Orem, the realistic options are buying an existing house and changing it, or infill. That is why additions, whole-home renovations, and basement build-outs are the bread and butter here.
How old are Orem houses, really?
Newer than people assume. The median year built in Orem is 1989, and the single largest decade is the 1970s. Only about a third of the housing predates 1980. There is a real 1950s and 1960s core from the postwar boom, but Orem is better described as a 1970s through 1990s suburban build-out. That matters for a remodel budget, because a 1978 house and a 1958 house are genuinely different jobs in terms of wiring, insulation, and framing.
Is the ground a problem anywhere in Orem?
Mostly on the west side. Orem's general plan flags the low-lying Lakeview area toward Utah Lake for high groundwater, wetlands, the fluctuating level of the lake, and what it calls high potential for liquefaction during an earthquake. Orem's subdivision code carries supplementary design standards covering hillside development, seismic areas, floodplains, and high water table areas. Worth knowing: the city's published FEMA flood layer is based on a map with a 1984 effective date, and Orem's own metadata says it should be updated. Do not rely on it as the last word on a specific lot.
Who provides irrigation water in Orem?
Not the city, which surprises people. Orem states that the irrigation canals are owned and maintained by private irrigation companies operating within the city, and points residents to a map to find which company serves their address. There are roughly 86 miles of irrigation ditches in Orem and the season runs about April through October. On a landscape or outdoor living project, that is a phone call to a company, not to city hall.
Can I add an accessory apartment to an Orem house?
Orem treats accessory apartments as a registered, permitted category. The city publishes an accessory apartment information sheet and checklist, and it maintains a map layer of legal accessory apartments. That means the path exists and it is documented, but it also means an unpermitted basement apartment is visible to the city. Confirm the current requirements with Community Development before you plan around them, because accessory dwelling rules across Utah have been changing.

Nearby

Other cities we build in nearby

Orem sits between Provo and the north end of the county. Each of these cities permits, waters, and powers a job differently.

Tell us what you want to change about your Orem house

An addition, a whole-home renovation, a basement, or a commercial build-out. The first conversation is free and it is with Danny.

Or call or text (801) 735-7186
Call or text (801) 735-7186 Free estimate