Home / Service areas / Orem

Construction · Orem, UT

Remodels, additions, and new builds in Orem, Utah

Orem is close to built out. Most work here means changing a house that already stands, not starting from dirt. That is a different skill from tract building. Danny Bird has been building since 2001.

Building since 2001 Based in Provo, working across Utah County Plans and building, one team
A real budget before drawings Additions and whole house remodels One builder, start to finish

The local picture

A city with almost no land left, which changes everything

Orem grew up on the Provo Bench, and it was orchards before it was houses. The city's own general plan describes a farm community where farms, orchards, and open fields covered the land. The ground was rich enough that the area helped earn Provo its old name, the Garden City of Utah.

Then it grew fast. Orem counted 8,351 people in 1950 and 18,394 in 1960. By 1980 it was 52,399, and the 2020 census counted 98,129. The push started with Geneva Steel, built in the early 1940s for the war effort. Orem adopted its first zoning ordinance in 1946.

Today the city is basically full. Orem's general plan counted about 889 acres undeveloped. That is under 8 percent of the city, and only about 378 acres of it is zoned residential. So the work here is remodels, additions, finished basements, and infill. Infill means building in the empty gaps between what is already there. If someone offers to build you a new house in Orem, the first question is where.

Renovated kitchen and dining area with an island and full height cabinetry

Permits and approvals

How Orem actually reviews a project

Orem publishes more of its own rules than most Utah County cities. That makes it easier to plan against, once you know where to look.

Community Development and CityInspect

Permits come from the Community Development Department at 56 North State Street. It holds Building Safety, Engineering, and Planning and Zoning. You apply online through CityInspect.

The Development Review Committee runs weekly

Site plan and subdivision work goes to the DRC on a weekly cycle. Pay by Monday at noon to be reviewed that week. Redlines come back by email on Tuesday. Miss the Monday and you have lost a week.

What the city asks for is specific

You need wet-stamped structural calculations, signed by an engineer. Sloped lots need a plot plan that shows the ground heights. Any new build that adds 500 square feet or more of footprint needs a stormwater pollution prevention plan.

Retaining walls have their own permit

Any retaining wall four feet or taller needs its own permit. That height is measured from the bottom of the footing. On a sloped Orem lot, that is real work and real money, not a detail.

Design criteria and ground

The numbers and the conditions that set an Orem budget

Orem publishes its local design criteria. Its general plan is honest about where the ground gets hard.

Frost depth of 30 inches

Footings go below that line. That covers the house, the porch piers, and any slab that has to stay put. It is a fixed cost on every foundation in the city.

115 mph design wind speed

This sets the sheathing, the nailing, and the connections. It matters most on tall walls, big glass, and covered outdoor structures. Those are exactly what people add to an Orem house.

High groundwater on the west side

Orem's general plan flags the low Lakeview area toward Utah Lake. It lists a high water table, wetlands, a lake level that rises and falls, and high potential for liquefaction during an earthquake. Liquefaction is when soaked, sandy soil acts like a liquid while the ground shakes.

Hazard rules live in the subdivision code

Orem has no hillside or geologic overlay zone. Its subdivision code carries extra design standards instead. Those cover hillside building, earthquake areas, floodplains, and high water table areas.

Neighborhoods

Orem has 22 officially named neighborhoods across nine districts

Where the house sits changes its age, its framing, and often its ground. These are the city's own names, not marketing labels.

Against the mountains

Canyon View, Cascade, and Orchard sit on the east side near the mouth of Provo Canyon. The Olmsted Station powerhouse has stood there since 1904, and US-189 heads up toward Heber.

The central postwar core

Orem, Sharon, Sharon Park, Hillcrest, and Orem North hold much of the older housing. That includes the homes that went up around the Geneva Steel boom years.

The 1970s and 1980s expansion

Heatheridge, Northridge, Windsor, Aspen, and Timpview went up in the decades when Orem grew fastest. Solid framing, dated systems, and floor plans people now want opened up.

Toward the lake

Lakeview and Lakeridge run west and south toward Utah Lake. This is where the general plan puts its high groundwater and liquefaction concerns.

Geneva Heights and the west side

Named for the steel mill era, though the mill site itself sits in Vineyard, not Orem. Christeele Acres is a listed historic district here. It was built in 1943 as Geneva Steel worker housing.

Around University Place and UVU

The old University Mall opened in 1973. It has since been rebuilt as a mixed-use district. Utah Valley University sits on former farmland in southwest Orem, next to I-15.

Every service, in Orem

Every Blackbird service, available in Orem

Blackbird sorts ten services into plan, build, and improve. Orem has almost no empty land, so most projects here live in the improve group. The planning services are what keep a big remodel from turning into a bad surprise.

Pre-construction: planning before you build

We check whether the job can work. We settle what is included. Then we plan it, before anyone draws it.

Construction cost estimating: a real budget first

A line by line budget for Orem labor, materials, and site work. You get it before you commit to anything.

Owner's representative: someone on your side

Someone on your side who checks the builder's work and your bills. We read the plans and the bids too. No hammers, just your side of the table.

Design-build: one team from plans to finished

We draw the plans and build it too. Design, budget, permits, engineering, and building all sit under one contract. One place to call, and one place to point.

Custom home building

New custom homes on Orem lots. We price the house against the real site before the drawings are done.

Commercial construction and tenant improvements

New space, remodels, and add-ons for Orem businesses and building owners.

Multi-family construction

Apartments, townhomes, and condos. We start with the first look at whether the numbers work, and finish at the certificate of occupancy.

Home remodeling and additions

Whole house remodels, additions, and structural changes. Most Orem houses date from the 1970s through the 1990s. They were built to a builder's plan, not to yours.

Basement finishing

Bedrooms, baths, kitchens, theaters, and gyms in space you already own.

Outdoor living

Covered patios, porches, decks, and outdoor kitchens. We do the grading and drainage that make a yard work.

Recent work

Finished Blackbird work

Blackbird is based in Provo and works across Utah County. The photos below come from a Provo project. We label them that way on purpose.

Two story home after a full exterior renovation with new cladding, roof, and windows
A finished Blackbird project in ProvoWhole home renovation
The same home before renovation with original cladding and windows
The same house, beforeBefore
Renovated kitchen with an island and full height cabinetry
A finished Blackbird project in ProvoKitchen

Commercial property in Orem?

This page is written for homeowners

Building new, remodeling a building you own, or fitting out space for a tenant? The schedule and the permit path are different. We keep all of that on its own page.

Commercial contractor in Orem

Questions

Building in Orem

Who issues building permits in Orem?
Orem's Community Development Department at 56 North State Street. It holds Building Safety, Engineering, and Planning and Zoning. You submit permits online through CityInspect. If your project needs a site plan or a subdivision, it also goes to the Development Review Committee. That committee runs on a weekly cycle. Pay by Monday at noon to be reviewed that week, and redlines come back by email on Tuesday. Knowing that cycle is the difference between losing a week and not.
Why is so much Orem work remodeling instead of new construction?
Because Orem has basically run out of land. The city's own general plan counted about 889 acres undeveloped. That is under 8 percent of the total land area, and only about 378 acres of it is zoned residential. That is room for a few thousand more residents, not a new suburb. If you want to live in Orem, you have two real choices. Buy a house that already stands and change it, or build in one of the empty gaps. That is why additions, whole house remodels, and finished basements are the bread and butter here.
How old are Orem houses, really?
Newer than people assume. The median year built in Orem is 1989, and the biggest single decade is the 1970s. Only about a third of the housing was built before 1980. There is a real 1950s and 1960s core from the postwar boom. Even so, Orem is better described as a 1970s through 1990s suburb. That matters for a remodel budget. A 1978 house and a 1958 house are truly different jobs on wiring, insulation, and framing.
Is the ground a problem anywhere in Orem?
Mostly on the west side. Orem's general plan flags the low Lakeview area toward Utah Lake. It lists high groundwater, wetlands, a lake level that rises and falls, and what it calls high potential for liquefaction during an earthquake. Liquefaction is when soaked, sandy soil acts like a liquid while the ground shakes. Orem's subdivision code carries extra design standards for hillside building, earthquake areas, floodplains, and high water table areas. One thing worth knowing: the city's published FEMA flood layer is based on a map with a 1984 effective date, and Orem's own metadata says it should be updated. Do not treat it as the last word on a specific lot.
Who provides irrigation water in Orem?
Not the city, which surprises people. Orem says the irrigation canals are owned and kept up by private irrigation companies working inside the city. The city points residents to a map to find which company serves their address. Orem has about 86 miles of irrigation ditches, and the season runs about April through October. On a landscape or outdoor living project, that is a call to a company, not to city hall.
Can I add an accessory apartment to an Orem house?
Orem treats accessory apartments as a registered, permitted category. The city publishes an accessory apartment information sheet and a checklist. It also keeps a map layer of legal accessory apartments. So the path exists and it is written down. It also means an unpermitted basement apartment is visible to the city. Confirm the current requirements with Community Development before you plan around them, because accessory dwelling rules across Utah have been changing.

Nearby

Other cities we build in nearby

Orem sits between Provo and the north end of the county. Each of these cities handles permits, water, and power its own way.

Tell us what you want to change about your Orem house

An addition, a whole house remodel, a basement, or business space. The first talk is free, and it is with Danny.

Or call or text (385) 334-5658
Call or text (385) 334-5658 Free estimate